Home page / Realizations / Kronospan Szczecinek – made technological foundations for a new recycling line.

Kronospan Szczecinek – made technological foundations for a new recycling line.

Kronospan Szczecinek – made technological foundations for a new recycling line.

 

The scope of fundamental technological works as part of the production expansion in Szczecinek. As part of the employment contract of the former TM-01 foundation; 02; 03 with a fraction of 5000 m3 and 400 tons of reinforcement. Part of the foundations was made in connection with the ground conditions, in an 8 m deep excavation using driven steel sheet pile walls 12 m deep. The height of the foundation walls is 8 m above ground level.

Last realizations

WAREHOUSES AT ŚW. MICHAŁ 100 IN POZNAŃ

Construction of two stages of the warehouse at ul. Saint Michała 100 in Poznań with a total area of 8,300 m2. Completion time of each stage – 5 months from the moment of handing over the construction site. Development area of stage I, completed in 2021. – 3,650 m2. Development area of stage II, completed […]

Construction of two stages of the warehouse at ul. Saint Michała 100 in Poznań with a total area of 8,300 m2. Completion time of each stage – 5 months from the moment of handing over the construction site. Development area of stage I, completed in 2021. – 3,650 m2. Development area of stage II, completed […]

Extension of the service building – car showroom with workshop Investor – Authorized Dealer of Nissan A. i R. Polody Sp. J Subject of the investment – extension of the equipment of the service building in the field of servicing and trading in passenger cars. Description: Two parts: 1. Showroom – two-story, required for parking/exhibition […]

H&H Development Korczaka 6, Śrem

H&H Development Korczaka 6, Śrem   A multi-family building with four floors above ground with a residential function, using the improved application method. There are 24 apartments on each above-ground floor, which include a balcony/loggia or terrace with a garden. Large glazing provides good sunlight to the interior. A monolithic underground parking lot under the […]

Development of Morasko Park Duda

Development of Morasko Park Duda Large complex in Poznań, at Morasko Street. The construction of the large Morasko Park facilities was postponed in 2017 and then in 2020. The developer of the building is Duda Development from Poznań. At a distance of 1,588 km. there is the Greater Poland Center of Advanced Technologies, 1,736 km. […]