Modernization of halls E and F of the tram depot at Forteczna in Poznań, together with installations and technologies for the Municipal Transport Company in Poznań.

 

The scope of modernization works of halls E and F at the active tram depot at Forteczna 2 in Poznań. As part of the above-mentioned civil servants’ remuneration, demolition of the structure of hall F (repair hall of tram structures with their washing and social components) of a steel-skeleton structure with a tram track, operating equipment, including track turntables, an 8 t crane, a davit 7.5 tons As part of hall E (repair hall of the tram rolling stock) with an official including a reinforced concrete test duct and the construction of steel platforms for servicing the upper parts of the rolling stock along with the tram track, external equipment including tram defenses, column lifts 8 pcs and 12 pcs , hoists 2.5 t, signaling system for inspections of tramway railways, measurement of axial devices, execution of efficient traction network for each station 1/3; 3/2; 4/1;4;2 together with traction network automation more efficiently. Comprehensive electrical, teletechnical, sanitary and sanitary installations were made in the modernized facilities. Reconstruction reinforced with the execution of the tram track, catenary, outside the modernized halls E and F.

  • Gallery

Last realizations

WAREHOUSES AT ŚW. MICHAŁ 100 IN POZNAŃ

Construction of two stages of the warehouse at ul. Saint Michała 100 in Poznań with a total area of 8,300 m2. Completion time of each stage – 5 months from the moment of handing over the construction site. Development area of stage I, completed in 2021. – 3,650 m2. Development area of stage II, completed […]

Construction of two stages of the warehouse at ul. Saint Michała 100 in Poznań with a total area of 8,300 m2. Completion time of each stage – 5 months from the moment of handing over the construction site. Development area of stage I, completed in 2021. – 3,650 m2. Development area of stage II, completed […]

Extension of the service building – car showroom with workshop Investor – Authorized Dealer of Nissan A. i R. Polody Sp. J Subject of the investment – extension of the equipment of the service building in the field of servicing and trading in passenger cars. Description: Two parts: 1. Showroom – two-story, required for parking/exhibition […]

H&H Development Korczaka 6, Śrem

H&H Development Korczaka 6, Śrem   A multi-family building with four floors above ground with a residential function, using the improved application method. There are 24 apartments on each above-ground floor, which include a balcony/loggia or terrace with a garden. Large glazing provides good sunlight to the interior. A monolithic underground parking lot under the […]

Development of Morasko Park Duda

Development of Morasko Park Duda Large complex in Poznań, at Morasko Street. The construction of the large Morasko Park facilities was postponed in 2017 and then in 2020. The developer of the building is Duda Development from Poznań. At a distance of 1,588 km. there is the Greater Poland Center of Advanced Technologies, 1,736 km. […]