Home page / Realizations / WAREHOUSES AT ŚW. MICHAŁ 100 IN POZNAŃ

WAREHOUSES AT ŚW. MICHAŁ 100 IN POZNAŃ

Construction of two stages of the warehouse at ul. Saint Michała 100 in Poznań with a total area of 8,300 m2. Completion time of each stage – 5 months from the moment of handing over the construction site. Development area of stage I, completed in 2021. – 3,650 m2. Development area of stage II, completed in 2022. – 4,650 m2.

The scope of work included the preparation of a construction and executive design along with the construction of a warehouse building.

 

The main structure of the hall is made of prefabricated reinforced concrete columns rigidly connected to foundation footings. The roof structure of the hall is a system of simply supported lattice trusses. Light hall roof – the load-bearing roof covering is made of trapezoidal sheet metal installed in a purlinless system, with thermal insulation made of mineral wool, protected against moisture using a PVC roof membrane. The hall’s casing consists of sandwich panels in three colors, installed horizontally. The facility has a separate dock area.

 

A warehouse building consisting of storage premises and a social area consisting of a social room and women’s and men’s toilets. An unloading ramp was designed in the south-eastern part of the building.

Volume

27,421.93 m3

Height                                                 8.32 m

Length                                                 81.50 m

Width                                                 81.52 m.

Last realizations

WAREHOUSES AT ŚW. MICHAŁ 100 IN POZNAŃ

Construction of two stages of the warehouse at ul. Saint Michała 100 in Poznań with a total area of 8,300 m2. Completion time of each stage – 5 months from the moment of handing over the construction site. Development area of stage I, completed in 2021. – 3,650 m2. Development area of stage II, completed […]

Construction of two stages of the warehouse at ul. Saint Michała 100 in Poznań with a total area of 8,300 m2. Completion time of each stage – 5 months from the moment of handing over the construction site. Development area of stage I, completed in 2021. – 3,650 m2. Development area of stage II, completed […]

Extension of the service building – car showroom with workshop Investor – Authorized Dealer of Nissan A. i R. Polody Sp. J Subject of the investment – extension of the equipment of the service building in the field of servicing and trading in passenger cars. Description: Two parts: 1. Showroom – two-story, required for parking/exhibition […]

H&H Development Korczaka 6, Śrem

H&H Development Korczaka 6, Śrem   A multi-family building with four floors above ground with a residential function, using the improved application method. There are 24 apartments on each above-ground floor, which include a balcony/loggia or terrace with a garden. Large glazing provides good sunlight to the interior. A monolithic underground parking lot under the […]

Development of Morasko Park Duda

Development of Morasko Park Duda Large complex in Poznań, at Morasko Street. The construction of the large Morasko Park facilities was postponed in 2017 and then in 2020. The developer of the building is Duda Development from Poznań. At a distance of 1,588 km. there is the Greater Poland Center of Advanced Technologies, 1,736 km. […]