Kronospan Szczecinek – made technological foundations for a new recycling line.
Kronospan Szczecinek – made technological foundations for a new recycling line.
The scope of fundamental technological works as part of the production expansion in Szczecinek. As part of the employment contract of the former TM-01 foundation; 02; 03 with a fraction of 5000 m3 and 400 tons of reinforcement. Part of the foundations was made in connection with the ground conditions, in an 8 m deep excavation using driven steel sheet pile walls 12 m deep. The height of the foundation walls is 8 m above ground level.