Modernization of halls E and F of the tram depot at ul. Forteczna in Poznań, including installations and mobile devices

Poznań

Modernization of halls E and F of the tram depot at ul. Forteczna in Poznań, including installations and mobile devices

Scope of work supervising the modernization of halls E and F of the accessible tram depot at ul. Forteczna 2 in Poznań. As part of the above-mentioned demolition of the existing buildings, hall F (tram car repair hall with their washing and social areas) was delivered with a steel-skeleton structure along with a tram track, equipped with teaching facilities, including track turntables, an 8t overhead crane, and a 7-foot crane. 5 tons. As part of Brake E (tram rolling stock repair hall), it was made of industrial-strength reinforced concrete and bridge structures for servicing the upper parts of the rolling stock along with a tram track, technological equipment including tram defenses, 8 and 12 column lifts, 2 hoists , 5 t, tram route notification system, axial route measurement, construction of an outgoing traction network on each route 1/3; 3/2; 4/1;4;2 with traction network automation. Comprehensive electrical, telecommunications, sanitary and electrical installations were installed in the modernized facilities. The main reconstruction will include the tram tracks and traction network outside the modernized halls E and F.

Last realizations

WAREHOUSES AT ŚW. MICHAŁ 100 IN POZNAŃ

Construction of two stages of the warehouse at ul. Saint Michała 100 in Poznań with a total area of 8,300 m2. Completion time of each stage – 5 months from the moment of handing over the construction site. Development area of stage I, completed in 2021. – 3,650 m2. Development area of stage II, completed […]

Construction of two stages of the warehouse at ul. Saint Michała 100 in Poznań with a total area of 8,300 m2. Completion time of each stage – 5 months from the moment of handing over the construction site. Development area of stage I, completed in 2021. – 3,650 m2. Development area of stage II, completed […]

Extension of the service building – car showroom with workshop Investor – Authorized Dealer of Nissan A. i R. Polody Sp. J Subject of the investment – extension of the equipment of the service building in the field of servicing and trading in passenger cars. Description: Two parts: 1. Showroom – two-story, required for parking/exhibition […]

H&H Development Korczaka 6, Śrem

H&H Development Korczaka 6, Śrem   A multi-family building with four floors above ground with a residential function, using the improved application method. There are 24 apartments on each above-ground floor, which include a balcony/loggia or terrace with a garden. Large glazing provides good sunlight to the interior. A monolithic underground parking lot under the […]

Development of Morasko Park Duda

Development of Morasko Park Duda Large complex in Poznań, at Morasko Street. The construction of the large Morasko Park facilities was postponed in 2017 and then in 2020. The developer of the building is Duda Development from Poznań. At a distance of 1,588 km. there is the Greater Poland Center of Advanced Technologies, 1,736 km. […]