MPK WASH CARE in Poznań
MPK WASH CARE in Poznań
The investment includes the demolition of the old car wash facilities and the opening of a new building. Single-story hall with no basement. The main structure includes steel frames and the use of a masonry wall with silk roofing, it is a single-pitch structure made of steel sheets, PIR boards and a characteristic membrane. There are tram tracks and a car wash facility available along the facility. The car wash technology was launched as a car wash servicing rails in two ways: mobile and stationary. All walls are made of ceramic tiles to a height of 5.0 m, and the floor is made of Sikafloor PURCEM resin. At entry and exit mounted in gates with tram services. On facilities located indoors as well as in technical and industrial rooms.