Home page / Realizations / Volkswagen ANTONINEK

Volkswagen ANTONINEK

Volkswagen ANTONINEK

Making a recess in the floor in the active VW hall no. 1 in Antoninek. Trim in the form of a reinforced concrete bathtub with dimensions of 5.1 m x 3.6 m, depth of 1 m, made with the installation of two lifts. BSI’s scope of work included the demolition of the infectious floor. 40 cm, half-work combined with excavation and construction of a reinforced concrete foundation and reconstruction of the floor. An additional difficulty is the active production in the assembly hall during the works, which operates only on weekends for a limited period of time.

Last realizations

WAREHOUSES AT ŚW. MICHAŁ 100 IN POZNAŃ

Construction of two stages of the warehouse at ul. Saint Michała 100 in Poznań with a total area of 8,300 m2. Completion time of each stage – 5 months from the moment of handing over the construction site. Development area of stage I, completed in 2021. – 3,650 m2. Development area of stage II, completed […]

Construction of two stages of the warehouse at ul. Saint Michała 100 in Poznań with a total area of 8,300 m2. Completion time of each stage – 5 months from the moment of handing over the construction site. Development area of stage I, completed in 2021. – 3,650 m2. Development area of stage II, completed […]

Extension of the service building – car showroom with workshop Investor – Authorized Dealer of Nissan A. i R. Polody Sp. J Subject of the investment – extension of the equipment of the service building in the field of servicing and trading in passenger cars. Description: Two parts: 1. Showroom – two-story, required for parking/exhibition […]

H&H Development Korczaka 6, Śrem

H&H Development Korczaka 6, Śrem   A multi-family building with four floors above ground with a residential function, using the improved application method. There are 24 apartments on each above-ground floor, which include a balcony/loggia or terrace with a garden. Large glazing provides good sunlight to the interior. A monolithic underground parking lot under the […]

Development of Morasko Park Duda

Development of Morasko Park Duda Large complex in Poznań, at Morasko Street. The construction of the large Morasko Park facilities was postponed in 2017 and then in 2020. The developer of the building is Duda Development from Poznań. At a distance of 1,588 km. there is the Greater Poland Center of Advanced Technologies, 1,736 km. […]