{"id":1226,"date":"2023-11-23T13:09:38","date_gmt":"2023-11-23T13:09:38","guid":{"rendered":"http:\/\/bsic.pl\/?post_type=realizations&#038;p=1226"},"modified":"2023-11-23T13:09:38","modified_gmt":"2023-11-23T13:09:38","slug":"volkswagen-antoninek","status":"publish","type":"realizations","link":"https:\/\/bsic.pl\/?realizations=volkswagen-antoninek&lang=en","title":{"rendered":"Volkswagen ANTONINEK"},"content":{"rendered":"<p>Volkswagen ANTONINEK<\/p>\n<p>Making a recess in the floor in the active VW hall no. 1 in Antoninek. Trim in the form of a reinforced concrete bathtub with dimensions of 5.1 m x 3.6 m, depth of 1 m, made with the installation of two lifts. BSI&#8217;s scope of work included the demolition of the infectious floor. 40 cm, half-work combined with excavation and construction of a reinforced concrete foundation and reconstruction of the floor. An additional difficulty is the active production in the assembly hall during the works, which operates only on weekends for a limited period of time.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Volkswagen ANTONINEK Making a recess in the floor in the active VW hall no. 1 in Antoninek. Trim in the form of a reinforced concrete bathtub with dimensions of 5.1 m x 3.6 m, depth of 1 m, made with the installation of two lifts. BSI&#8217;s scope of work included the demolition of the infectious [&hellip;]<\/p>\n","protected":false},"template":"","acf":[],"_links":{"self":[{"href":"https:\/\/bsic.pl\/index.php?rest_route=\/wp\/v2\/realizations\/1226"}],"collection":[{"href":"https:\/\/bsic.pl\/index.php?rest_route=\/wp\/v2\/realizations"}],"about":[{"href":"https:\/\/bsic.pl\/index.php?rest_route=\/wp\/v2\/types\/realizations"}],"version-history":[{"count":0,"href":"https:\/\/bsic.pl\/index.php?rest_route=\/wp\/v2\/realizations\/1226\/revisions"}],"wp:attachment":[{"href":"https:\/\/bsic.pl\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}